SCOPE OF SERVICES
Talon Energy Services provides energy services and solutions to the oil & gas, resource, and heavy industrial sectors. With a single point of contact for personnel, engineering, fabrication, fabric maintenance, construction, commissioning, and maintenance services, the client can experience a full-service solution with Talon.
Talon has a quality management system and safety management system that has been reviewed and approved by lSNet World and CanQual, and is in use with clients in Western Canada.
Talon’s track record, financial strength, insurance, and bonding capacity provide the group with great contracting ability.
CERTIFICATIONS
ABSA – CERTIFICATE OF AUTHORIZATION PERMIT (QUALITY MANAGEMENT SYSTEM)
- Registration No. – AQP-21424
- Construct, Repair/Alter – B31.1 & B31.3
- Construct-Assemble Direct Fired Heaters
- Repair/Alter Section VIII-1, I, IV
CWB CERTIFICATION
- Registration No. – ACQUA1
- Certified to CSA Standard W47.1
CANQUEL REGISTERED
- CQS Approval
ISNET REGISTERED
- Cenovus Energy Inc.
- Devon Canada Corporation
- Enbridge Pipelines Inc.
- Husky Energy
- Ledcor Industrial Maintenance
- Nexen Energy ULC
- The DOW Chemical Company
Western Projects
Client | Project | Location | Year |
---|---|---|---|
SAIPEM | Electrical and Instrumentation Works - CNRL Site | ALBERTA | 2014 |
CENOVUS | Master Construction Contract - Foster Creek & Christina Lake | ALBERTA | 2012-15 |
SAIPEM | Recycle Gas Heater Construction-CNRL Site | ALBERTA | 2013 |
CENOVUS | Master Construction Contract (MCC) - Site Mechanical Services | ALBERTA | 2011 |
CENOVUS | Master Services Agreement (MSA) Electrical & Mechanical Inspection Services | ALBERTA | 2011 |
NEXEN | Instrumentation Support for Boiler Outage | ALBERTA | 2010 |
SHELL | Scotford Upgrader | ALBERTA | 2010 |
NEXEN | Long Lake Upgrader - E & I Maintenance Services (ASU) | ALBERTA | 2010 |
NEXEN | Commissioning Long Lake Upgrader Project | ALBERTA | 2010 |
AIR LIQUIDE | Electrical and Instrumentation Services | ALBERTA | 2009 |
OPTI CANADA | Installation of Flowmeter - Diluent Pump Lines | ALBERTA | 2009 |
NEXEN | CO Monitors of XV Valves on Upgrader Facility | ALBERTA | 2009 |
AIR LIQUIDE | Electrical and Instrumentation Services | ALBERTA | 2009 |
NEXEN | Installation of Flowmeter - Diluent Pump Lines | ALBERTA | 2009 |
NEXEN | Replacement of XV Valves on Upgrader Facility | ALBERTA | 2009 |
NEXEN | Installation & Calibration of New Vortex Meters | ALBERTA | 2009 |
AIR LIQUIDE | Installation & Calibration of Teleflo Meters | ALBERTA | 2009 |
NEXEN | Installation of Upgrader I/O Panel Cooling System | ALBERTA | 2009 |
OPTI CANADA | Installation & Calibration of Utility Boiler Airflow Meters | ALBERTA | 2009 |
OPTI CANADA | Hazardous Waste Storage Facility | ALBERTA | 2008 |
OPTI CANADA | Installation of Power Supply to South Security Gates | ALBERTA | 2008 |
LEDCOR | Supply of Personnel for the Long Lake Project | ALBERTA | 2006 |